Things left to do. Layout for hold down T-nuts and screws. Skirting around the sides, top and bottom. Biggest hurdle there are the angle cuts. Then, the top piece drilled with access holes to the T-nuts. Attach T-nuts. Put top in place and secure.
Then if things work out the way I hope they do, I'll fasten some U-bolts to the legs to support a shelf for a pitch bowl, sandbag, a hammer or two, and this, that and whatever.
No comments:
Post a Comment